If lines and transformers are switched off during optimization, it is possible that contingencies from case.con can no longer occur, because the affected asset is already switched off.
How is this to be handled?
Should the results of these contingencies be equal to those of the base case in these cases?
Thanks
In the case of a contingency K defined by the outage of a grid element J that was already disconnected in the base case, all of the general rules apply: